The new Donner Road is now open! The roadway improves connectivity, safety, drainage, utility and aesthetics. Here are the project highlights.
Connectivity and Safety
- Larger, standard-width lanes
- Curb-and-gutter
- 8-foot multiuse path for bicyclists and pedestrians
- Eliminated mid-block crosswalk at Jordan Street
Drainage and Utilities
- New drainage system
- Future connection to stormwater drain from Stanley Road
- New emergency outfall line
- Improved water and sewer lines
Aesthetics
- New board-on-board 6-foot fence along the entire southern edge of right-of-way
- Regraded dry stormwater pond at Sandpiper Lane
Questions? Email info@coab.us or call (904) 247-5804.