Donner Road Reconstruction

DonnerPhoto3July2022Donner Road Construction update (February 2023)


Donner Road construction is under way (July 2022)

Traffic will be impacted with detours for several months, at least. Please carefully follow the signage; at times, the road will be completely closed to traffic. Please make a special effort to avoid parking in the Donner Road right-of-way between during the daylight hours.

 Questions? Email info@coab.us or call Derek Martin, assistant public works director, at (904) 247-5834.

Project Goals

Improve Vehicle Transit

  • Construct standard-width lanes
  • Install curb-and-gutter
  • Pedestrian safety
  • Eliminate mid-block crosswalk at Jordan Street
  • Construct 8’ multiuse path

Drainage

  • Construct all new drainage system
  • Provide future connection to stormwater drain from Stanley Road

Utilities

  • Replace aging emergency outfall line
  • Repair water and sewer lines

Aesthetics

  • Construct new board-on-board 6’ fence along entire southern edge of right-of-way
  • Regrade dry stormwater pond at Sandpiper Lane

Traffic detour map

DonnerDetourSpring2022

April 2021: Pre-bid Donner Road reconstruction plan sheets

Notice: April 28, 2021 public meeting

Additional Information on this project is presented in a slide show below and available as a pdf by clicking here.